DOCUMENT | TITLE | COMPLIANCE | DATE |
Bell Helicopter | |||
ASB_204B-21-76 | Main Rotor Scissors & Sleeve Hub Assembly Collective 204-011-405-013 Identification | Alert | 12/20/2021 |
ASB_205-21-119 | Main Rotor Scissors & Sleeve Hub Assembly Collective 204-011-405-013 Identification | Alert | 12/20/2021 |
ASB_205B-21-73 | Main Rotor Scissors & Sleeve Hub Assembly Collective 204-011-405-013 Identification | Alert | 12/20/2021 |
ASB_212-21-167 | Main Rotor Scissors & Sleeve Hub Assembly Collective 204-011-405-013 Identification | Alert | 12/20/2021 |
ASB_UH-1H-22-22 | Main Rotor Scissors & Sleeve Hub Assembly Collective 204-011-405-013 Identification | Alert | 1/4/2022 |
ASB_210-22-16 | Main Rotor Scissors & Sleeve Hub Assembly Collective 204-011-405-013 Identification | Alert | 1/10/2022 |
ASB_407-21-124 | Fuel System Standpipe Assembly 407-062-032-103, One-Time Inspection and Rework of | Alert | 2/1/2022 |
ASB_204B-21-75-RA | Tailboom Attachment Hardware, Inspection and Replacement of | Alert | 2/23/2022 |
ASB_205-21-118-RA | Tailboom Attachment Hardware, Inspection and Replacement of | Alert | 2/23/2022 |
ASB_205B-21-72-RA | Tailboom Attachment Hardware, Inspection and Replacement of | Alert | 2/23/2022 |
ASB_212-21-166-RA | Tailboom Attachment Hardware, Inspection and Replacement of | Alert | 2/23/2022 |
ASB_412-21-187-RA | Tailboom Attachment Hardware, Inspection and Replacement of | Alert | 2/23/2022 |
ASB_412CF-21-72-RA | Tailboom Attachment Hardware, Inspection and Replacement of | Alert | 2/23/2022 |
ASB_210-21-15-RA | Tailboom Attachment Hardware, Inspection and Replacement of | Alert | 2/24/2022 |
ASB_UH-1H-II-22-33 | Tailboom Attachment Hardware, Inspection and Replacement of | Alert | 2/28/2022 |
BHT-412-MM-1 | 412-EP-EPI Inspection and Airworthiness Limitations | Manual | 3/10/2022 |
OSN_GEN-22-51 | Potential 5G C-Band Wireless Broadband Interference with Radio (Radar) Altimeter Equipment | Op. Safety | 1/20/2022 |
OSN_210-22-06 | Potential 5G C-Band Wireless Broadband Interference with Radio (Radar) Altimeter Equipment | Op. Safety | 1/31/2022 |
OSN_UH-1H-22-03 | Potential 5G C-Band Wireless Broadband Interference with Radio (Radar) Altimeter Equipment | Op. Safety | 1/31/2022 |
OSN_UH-1H-II-22-13 | Potential 5G C-Band Wireless Broadband Interference with Radio (Radar) Altimeter Equipment | Op. Safety | 1/31/2022 |
IL-GEN-22-152 | Contacting Product Support Engineering | Informational | 1/7/2022 |
IL_GEN-22-153 | Structural Repairs Policy Change | Informational | 1/20/2022 |
IL_GEN-18-141-RA | Procedure for Requesting Bell-Approved Structural Repairs | Informational | 2/15/2022 |
IL_GEN-22-154 | Procedure for Requesting Bell-Approved Structural Repairs | Informational | 2/15/2022 |
IL_429-17-03-RA | Curtis-Wright Service Bulletin D51615-31-19 Replacement of Underwater Locator Beacon (90-DAY) | Informational | 2/16/2022 |